One side done, the other will get done tomorrow. Though I have jacked up the other side to the right height to check for snags.
So far:
The handbrake cable looks OK once the brackets were unbolted from the body
The fuel outlet and return pipes from the tank are OK
The transmission selector lever is fine
The transfer box lever will need extending or bending a bit
The fuel filler and glug pipes will definately need extending
The fuel filter to pump pipe needs replacing with a longer length
The brake pipes had enough length in the curly-wurly piggy tails bits (technical term there) to stretch out and still leave some curled
The rad is still out, but will need mounting lower
Still haven't come up with a design for the bumper brackets
and I've got lots of room above the engine now.....and a top mounted intercooler is looking likely!
Regards
TFB
Comment