'fraid i can't help with your question but as an aside, how long would the knowledgeable members of the forum say it should take to remove a hot air heating system and replace it with rads in a small two bed house? i only ask as the guys doing this to a house opposite ours have been working for 11 days straight so far and there isn't even any sign of the boiler through the hole they've cut in the wall for the exhaust!
it took about two days for another company to do the same job in our identical house including changing us to a "pressurized hot water" system.
it took about two days for another company to do the same job in our identical house including changing us to a "pressurized hot water" system.
Comment