I need help with the workpit I'm building into the floor of my new garage (for a land cruiser restoration project). Being the DIY man that I am I am doing as much as possible myself but when it comes to reinforcing a wall with 5 feet of muck and water the far side of it I need advice.
The pit will be about 12 foot long and 3 and a half foot wide (1 metre). The walls will be approximately 6 to 7 inches thick and I've got sheets of A393 mesh to go into them.
Thing is, is one sheet of mesh sufficient or do I need to fix 2 sheets into each wall probably 2 inches apart??
The pit will be about 12 foot long and 3 and a half foot wide (1 metre). The walls will be approximately 6 to 7 inches thick and I've got sheets of A393 mesh to go into them.
Thing is, is one sheet of mesh sufficient or do I need to fix 2 sheets into each wall probably 2 inches apart??
Comment