Dont look like i'm going to get much done on the truck this side of xmas which is a real pi$$er as i got a tow bar, rear bar and roof spots ready to go on, plus the chassi paint etc, what started as doin the bedroom out has turned into a big strip down, i pulled off some plactic conduit on the ceiling fan and half the artex fell off, so as these places have no earth on the lighting circuit i decieded to cut out some ceiling and try and replace at least the wireing in the bedroom (i can continue it through the other rooms later) at least i wont have to get the ceiling down or the floor up again in this room especially as she wants solid wood flooring, Im rerunning the heating and electric's round behind the skirting so i can get at it if need be, also have to fit a bannister and spindles and im no carpenter, managed to chizel out the remains of the old newell post at the bottom of the stairs without F**king up the joint on the stair main beam, this is really taxing my chizeling skills, Then there's that chinese made nordic steam/shower thing to fit (no bl00dy instructions), at least it seems to be all there and not damaged, a few pics attached, i boarded over the hole above our bed in case anything with legs fell out in the night and went in my open gob

Comment