If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
when i've finished doing up mates houses i better get some directions, you 2 been faffing about there for ever!
101 days actual work time so far (just spread over 9 months). Thats about 3 1/2 months to totally gut and refurb a 3 bed house. I have to think about it that way so I dont go MAD (der)
However you are more than welcome to come round at weekends and help. I would supply BEER!
101 days actual work time so far (just spread over 9 months). Thats about 3 1/2 months to totally gut and refurb a 3 bed house. I have to think about it that way so I dont go MAD (der)
However you are more than welcome to come round at weekends and help. I would supply BEER!
whats left to do? and dont give beer til i've stopped...!
why not have a surf meet in stevenage! theres loads of builds type people on here who could do with getting in your good books! and it would be really funny to see all them surfs parked up and down the street. ..
whats left to do? and dont give beer til i've stopped...!
why not have a surf meet in stevenage! theres loads of builds type people on here who could do with getting in your good books! and it would be really funny to see all them surfs parked up and down the street. ..
we need a corgi guy to reconnect the gas and certify.
some fence panels replacing,
lounge fire fitted,
lounge decorated,
rad in bedroom replumbed,
kitchen tiled,
dining laminate floor fitted,
kitchen painted,
bathroom cupboard built
carpet throughout
front wood behind gutter stripped and repainted - window frames rubbed down and painted
Shed door and window fitted,
greenhouse windows repaired.
patio lifted and relaid
bent and damaged downpipe fixed,
we need a corgi guy to reconnect the gas and certify.
some fence panels replacing,
lounge fire fitted,
lounge decorated,
rad in bedroom replumbed,
kitchen tiled,
dining laminate floor fitted,
kitchen painted,
bathroom cupboard built
carpet throughout
front wood behind gutter stripped and repainted - window frames rubbed down and painted
Shed door and window fitted,
greenhouse windows repaired.
patio lifted and relaid
bent and damaged downpipe fixed,
Thats all!!!
well im not corgi registered, and i cant lay carpets, any volenteers? if we get their house finished tony might get 1 of his projects runing!
Comment