I need some ideas how I can get concrete from a lorry 35 meters up a driveway to pour it for a slab for a garage base without needing to hire a concrete pump at £400 a day ? I may have the use of a dumper truck to put the concrete in but I need to have a channel drain and reinforcing mesh in the slab which I will need to go over to get to the furthest point at back of garden and work back up the garden towards the lorry . The nearest I can get the lorry to pour is 10 meters. Any ideas?
 

 
							
						
					I need some ideas how I can get concrete from a lorry 35 meters up a driveway to pour it for a slab for a garage base without needing to hire a concrete pump at £400 a day ? I may have the use of a dumper truck to put the concrete in but I need to have a channel drain and reinforcing mesh in the slab which I will need to go over to get to the furthest point at back of garden and work back up the garden towards the lorry . The nearest I can get the lorry to pour is 10 meters. Any ideas?

 
							
						


 
							
						 
  
							
						 Or as said before, vibrate mesh through concrete if its wet enough.
 Or as said before, vibrate mesh through concrete if its wet enough.
							
						
 
							
						
Comment