Hi
Van arrives at door new rad for Toyota at 4.30pm today write cheque pay for new rad.
Undo 2 12mm studs 2 pipe clips with yankee grips piece of cake 2 seconds rads out.
Open box while flushing muck out fix rubbers on hoses and fan.
Less than 10 minutes filled with coolant purged and back up and running.
Only wish surf was that easy this was our 1991 Carina 2, 1.6 XL.
Sorted JB
Van arrives at door new rad for Toyota at 4.30pm today write cheque pay for new rad.
Undo 2 12mm studs 2 pipe clips with yankee grips piece of cake 2 seconds rads out.
Open box while flushing muck out fix rubbers on hoses and fan.
Less than 10 minutes filled with coolant purged and back up and running.
Only wish surf was that easy this was our 1991 Carina 2, 1.6 XL.
Sorted JB